5/8/2019
Road Paving

 
Great Falls Chase Road Paving

 

Attention:
Darkhollow Falls, Rock Falls,
Waterfall Branch, Bridalveil Falls,
Butterwood Falls & Sunrise Terrace





Residents of Great Falls
Chase,




Dominion Paving & Sealing
Inc. has been hired to perform work within your community. We will be performing some concrete repairs, as
well as, re-paving and re-striping some of your roadways and parking spaces. This project will renew the life of your
asphalt surfaces as well as improve safety and aesthetics in your
community. Once completed, this project
will not need to be done again for some time. We ask for your patience and understanding while we work in your
neighborhood.




Your property will be broken
down into 3 sections as shown on the
accompanying map, and is scheduled for the dates below.

YELLOW - Darkhollow Falls and Rock Falls

RED - Waterfall Branch and Bridalveil Falls

BLUE - Butterwood Falls and Sunrise Terrace 


________________________________________________________________________



May 20th -
Asphalt Milling Section 1 (NO PARKING) YELLOW area on map


May 21st - Asphalt Paving/Striping
Section 1 (NO PARKING)




May 22nd - Asphalt Milling Section 2 (NO PARKING) RED area on map


May 23rd -
Asphalt Paving/Striping Section 2 (NO PARKING)




May 29th - Asphalt Milling Section 3 (NO PARKING) BLUE area on map


May 30th -
Asphalt Paving/Striping Section 3 (NO PARKING)




______________________________________________________________________________



Each Section will close at 7:00 am and
will reopen around 7:00 pm. Vehicles can
park as usual during the evening while the project is in progress. Please keep in mind that after the property
has been milled but before it is paved, the surface will be rough and not all surfaces
will be even. Please use caution while
walking across the milled surface.





Things to Remember




Parking – All vehicles must be out of the affected
parking areas by 7:00 AM on days when work is scheduled. Any vehicles not moved by 7:00 AM will be towed.




Vehicular Traffic – No traffic will be allowed on the parking lots and
roadways during the time your section is closed. Please abide by all barricades and signs;
they are for your safety!




Driveway/Garage Parking – You may park in your driveway while we are working,
but please realize that the roads will be closed on the dates indicated above starting
at 7:00 am and any vehicles parked in your driveway will be blocked in during
working hours. You cannot pull out of
your driveway once we have begun paving your street.




Pedestrians/Pets – Please stay off of the asphalt while the section is
closed. Walking through tack coat will
result in tracking of the product onto concrete sidewalks and even into your
homes. This is costly to clean and is
not the responsibility of Dominion Paving & Sealing or the Property
Management.




Weather – All dates are weather dependant. In the event of rain, we will be forced to
cancel the project for that day. You
will be notified as to when your parking lot has been rescheduled.



 

 